An electrical engineering and contracting company working on substations and distribution networks since 2009.

Seventeen years in power distribution

Peydezh Mavi Engineering (registration no. 510046) started work in 2009 as an electrical contractor. The company holds a contractor qualification in the Power discipline from Iran’s Plan and Budget Organization and builds substations, cable networks and overhead lines up to 63 kV.

Since then we have completed more than 140 projects. Our clients range from commercial and office complexes such as Tehran Mall, Ronika Mall and Teras Center to public facilities such as the National Post Company sorting centre and the central organisation of Islamic Azad University, as well as large residential developments, factories and network development projects for the Tehran electricity distribution company.

Today more than 150 people work on our projects: design and supervision engineers, technicians and installation crews. Our head office is in Tehran, and we take on projects in Iran and in neighbouring countries.

  • Registration number 510046
  • Contractor qualification in the Power discipline, Plan and Budget Organization of Iran
  • Substations and networks up to 63 kV
  • 150+ engineers and technicians, 140+ completed projects

Who we work for

Commercial and office complexes

Grid connection, dedicated substations and MV cabling for shopping centres and office buildings.

Large residential developments

Power supply for projects of several hundred units, from substation design to energisation.

Public and government facilities

Power supply and maintenance for post, university and environmental facilities.

Industry

Dedicated substations, MV/LV switchgear and capacitor banks for factories.

Distribution utilities

Development and construction of public LV and MV networks.

Network owners

Maintenance of 20 kV, LV and lighting networks for public and private owners.

How we work

  1. Survey and estimateWe assess the site, the existing network and the power the project needs.
  2. Design and approvalDrawings are prepared and submitted to the utility for approval.
  3. ProcurementEquipment is supplied to the approved specification.
  4. ConstructionWork is carried out under the utility’s supervision and with strict safety rules.
  5. Testing and handoverTests, inspection and energisation with the utility’s representative.
  6. MaintenanceOperation and maintenance of the substation and network, if the client requires it.

Why Peydezh Mavi?

2009Founded
150+Engineers and technicians
140+Completed projects
up to 63 kVVoltage level

Ready to discuss your project?

Contact our engineers for a site visit, technical advice or a quotation.